Author(s) | Dr Dean Roemmich, Dr Howard Freeland, Mr Mathieu Belbéoch |
---|---|
Summary | This document provides for an overview of the current, status of the Argo Pilot Project and the challenges it faces. |
Doc Type | Working Document |
Status | Published on 28 Apr 2009 |
Keywords | SOT SOT-V VOS VOSP SOOP SOOPIP ASAP ASAPP VOSClim Argo |
This document is in the list(s): |
[Working Documents] Observations Programme Area
|
This document is used in the event(s): |
Fifth Meeting of the JCOMM Ship Observations Team (SOT)
|