Author(s) | Jean Rolland, and Bill Woodward |
---|---|
Summary | This document provides information on the current status of the GTS delays encountered by observations received by both Argos and Iridium. It provides information on the present status and possible future improvements in the Argos network. |
Doc Type | Working Document |
Status | Published on 30 Aug 2011 |
Keywords | OPA DBCP DBCP-27 GTS delays timeliness Argos Iridium |
This document is used in the event(s): |
27th session of the Data Buoy Cooperation Panel
|