Process to adopt new GOOS Essential Ocean Variables (EOVs)

Summary

This document describes the steps that lead to the inclusion of a EOV in the GOOS EOV list and identifies who is in charge of each part of the process.

GOOS Steering Committee in its Online Intersessional meeting on 30 January 2024 approved the “Process to adopt new GOOS Essential Ocean Variables (EOVs)”. The process can be reviewed and re-submitted for approval to GOOS SC as required.

Doc Type Reference Document
Status Published on 19 Dec 2024
Notes

A first version was presented to the GOOS SC at their intersessional virtual meeting in January 2024 and a few edits were suggested at the meeting. The version v1.0 here presented includes those edits.

30 January 2024 - V1.0

 

This version was superseded  y v2.0, which is the one included in the EOV paper.

Keywords Essential Ocean Variables, adoption, observing system
This document is used in the event(s): GOOS Steering Committee Meeting (Virtual)

Created at 18:09 on 19 Dec 2024 by Belen Martin Miguez
Updated at 18:09 on 19 Dec 2024 by Belen Martin Miguez